Mekong Basin outputs
The MUS work in Mekong Basin is concentrated in Thailand. This section describes the integrated outputs emerging from the project in Mekong basin.
Home / Basins/Countries / Mekong Basin / Mekong Basin outputs
The MUS work in Mekong Basin is concentrated in Thailand. This section describes the integrated outputs emerging from the project in Mekong basin.
Learning alliance development for multiple water use system upscaling in Mekong basin. (Available October 2006)
Analysis of learning alliance strategies and development processes. (Available November 2006)
Stakeholder analysis on multiple water use system in the northeast of Thailand. (Available August 2006)
Institutional Analysis for multiple water use system development. (Available September 2006)
Facilitation techniques in multiple water use system development at farm and national scale. (Available December 2006)
Social and economic constraints of multiple water use system applications at farm scale in Mekong basin. (Available January 2007)
Multiple water use system development for economic sufficiency at household scale. (Available Feb 2007)
Models for multiple water use systems at household scale in the northeast of Thailand. (Available March 2007)
Potential application of Bonam model in Mekong basin for supporting farmer practices and government action plans. (Available April 2007)
Multiple water use system productivity at different ecozones in Mekong basin. (Available May 2007)